With a large range of environmental technologies Lodge Cottrell can provide plant upgrades to meet the most stringent emissions legislation. We can supply products from individual components to complete turnkey and partnering packages.
With the growing need to burn a mixed range of coals in power stations, together with revised boiler operations and new emission compliance standards, many existing precipitator installations require upgrading or the addition of precipitator capacity.
The upgrade techniques have been designed for Lodge Cottrell plants, but with only minor variations these can be applied to any other existing precipitator design.
 Lodge Cottrell has the necessary resources, experience and technology to engineer and execute such upgrades thanks to its extensive research and development (R & D) and testing facilities based in Birmingham.
All Lodge Cottrell design upgrade proposals will be
supported by new performance
guarantees.
Improving Existing Precipitator Performance
A seven point plan for practical and co-ordinated programmes to enable most existing precipitator plants to meet statutory emissions levels.
• Removal of mechanical pre-collectors where fitted
• Upgrade of collector system
• Upgrade of discharge electrodes
• Upgrade of collector electrode rapping
• Upgrade of discharge electrode rapping
• Optimisation and upgrading of electrical energisation
• Improvement and optimisation of gas distribution systems
|